Match List I with List II and choose the correct option.
List 1
x-t slope
v-t slope
projectile trajectory slope
curve normal slope
List 2
acceleration
velocity
dy/dx
-1/(dy/dx)
Options
Match List I with List II and choose the correct option.
List 1
x-t slope
v-t slope
projectile trajectory slope
curve normal slope
List 2
acceleration
velocity
dy/dx
-1/(dy/dx)
Options